Sample report

Building condition survey, example extract

A visual, non intrusive survey of a building, with a photographic schedule, a risk rating for each item, what needs doing now and what can wait, and a sensible order of work. Ideal for parish and town councils, charities and landlords planning their maintenance budget.

Example extract, prepared for illustration. Fictional property and findings.

1. Building details

Report referenceSML EX CS 051
BuildingSingle storey village hall, brick with pitched tiled roof, about 1960s (fictional)
ClientExample Parish Council
Survey typeVisual, non intrusive. Roof viewed from ground level and ladder at the eaves
Prepared bySurveyor

2. Summary

The hall is generally sound for its age. Seven items were recorded. One needs action before the winter: lead flashing at the gable abutment has lifted and the pointing above it has opened, giving water a direct path into the wall. The rest can be planned into the next two years of the maintenance budget.

3. Items raised, extract

RefElementItemRatingWhen
CS01Roof, gable abutmentLead flashing lifting at the edgeRedNow
CS02Walls, gableOpen pointing above flashing, water pathAmberWithin 6 months
CS03EavesFascia board weathering, paint failedAmberWithin 12 months
CS04Rainwater goodsGutter joint dripping at rear cornerAmberWithin 6 months
CS05WindowsTwo casements sticking, hinges wornGreenWithin 2 years

4. Recommended sequence

  1. Re dress and secure the lead before the next spell of heavy rain.
  2. Repoint the open joints around the abutment.
  3. Clear and reseal the gutters, then check for water paths at the roof edge.
  4. Prepare and repaint the fascias in dry weather.
  5. Recheck after the first wet spell.

Full reports include photographs of every item, a summary table for the council or trustees, and budget guidance where requested.

Planning repairs to a building?

Building condition surveys from £600, fixed fee agreed before the visit. Within 30 miles of Luton.

Call 07453 883869Email for a quote